From 1 - 8 / 8
  • The borehole information pack from borehole GGA04, site 02 of the UK Geoenergy Observatories (UKGEOS) Glasgow facility. This release from the British Geological Survey (BGS) contains BGS and Drillers’ logs, cased hole and open hole wireline data, a listing of archived rock chips and a descriptive report. The mine water characterisation and monitoring borehole was drilled between 28th June and 22nd October 2019 (start of drilling to casing installation date) to 53.63 m drilled depth. The cased borehole was wireline logged and hydrogeologically tested in January 2020. Rock chip samples were taken during the drilling process and have been archived at the National Geological Repository at BGS Keyworth. Further details can be found in the accompanying report http://nora.nerc.ac.uk/id/eprint/528078 DOI https://dx.doi.org/10.5285/83ab3481-45d9-475d-8814-008edc9fb1cb

  • The borehole information pack from borehole GGA01, site 01 of the UK Geoenergy Observatories (UKGEOS) Glasgow facility. This release from the British Geological Survey (BGS) contains BGS and Drillers’ logs, cased hole wireline data, a listing of archived rock chips and a descriptive report. The mine water characterisation and monitoring borehole was drilled between 11th June and 21st August 2019 (start of drilling to casing installation date) to 52 m drilled depth. The cased borehole was wireline logged and hydrogeologically tested in January 2020. Rock chip samples were taken during the drilling process and have been archived at the National Geological Repository at BGS Keyworth. Further details can be found in the accompanying report http://nora.nerc.ac.uk/id/eprint/528075, DOI https://dx.doi.org/10.5285/0d496c68-f79b-4956-8cd2-4970d1e86145.

  • The borehole information pack from borehole GGA05, site 02 of the UK Geoenergy Observatories (UKGEOS) Glasgow facility. This release from the British Geological Survey (BGS) contains BGS and Drillers’ logs, cased hole and open hole wireline data, optical camera data, a listing of archived rock chips and a descriptive report. The mine water characterisation and monitoring borehole was drilled between 1st July and 11th October 2019 (start of drilling to casing installation date) to 88.5 m drilled depth. The cased borehole was wireline logged and hydrogeologically tested in January 2020. Rock chip samples were taken during the drilling process and have been archived at the National Geological Repository at BGS Keyworth. Further details can be found in the accompanying report http://nora.nerc.ac.uk/id/eprint/528052 DOI https://dx.doi.org/10.5285/714fe9fc-ce77-4479-8053-1c5fd4e86f06

  • The borehole information pack from borehole GGC01, site 10 of the UK Geoenergy Observatories (UKGEOS) Glasgow facility. This intermediate data release pack from BGS contains sedimentology, discontinuity and engineering logs, as well as the information contained within the initial release: composite and digital wireline logs; drillers summary logs and prognosis; sample recovery information spreadsheets; and daily driller's borehole records. The cored, seismic monitoring borehole was drilled between 19 November and 12 December 2018 to 199m producing a core of 102 mm diameter. The borehole was wireline logged in December 2018 and a string of 5 seismometers were installed in February 2019. A range of fluid, water and core samples were taken during the drilling process. The borehole information pack- intermediate release contains a range of logs on the core as well as images of that core, these data were acquired in the first half of 2019. More information is available in the accompanying metadata report http://nora.nerc.ac.uk/id/eprint/525009.

  • The borehole information pack from borehole GGC01, site 10 of the UK Geoenergy Observatories (UKGEOS) Glasgow facility. This initial data release pack from BGS contains composite and digital wireline logs; drillers summary logs and prognosis; sample recovery information spreadsheets; and daily driller's borehole records. The cored, seismic monitoring borehole was drilled between 19 November and 12 December 2018 to 199m producing a core of 102 mm diameter. The borehole was wireline logged in December 2018 and a string of 5 seismometers were installed in February 2019. A range of fluid, water and core samples were taken during the drilling process.

  • The borehole information pack from borehole GGA08, site 03 of the UK Geoenergy Observatories (UKGEOS) Glasgow facility. This release from the British Geological Survey (BGS) contains BGS and Drillers’ logs, cased hole and open hole wireline data, optical camera, CCTV data, a listing of archived rock chips and a descriptive report. The mine water characterisation and monitoring borehole was drilled between 25th June and 6th December 2019 (start of drilling to casing installation date) to 91.37 m drilled depth. The cased borehole was wireline logged in January 2020 and hydrogeologically tested in February 2020. Rock chip samples were taken during the drilling process and have been archived at the National Geological Repository at BGS Keyworth. Further details can be found in the accompanying report http://nora.nerc.ac.uk/id/eprint/528081 DOIhttps://dx.doi.org/10.5285/b19497aa-75a5-4f51-8089-299f9229b9ca

  • The borehole information pack from borehole GGA07, site 03 of the UK Geoenergy Observatories (UKGEOS) Glasgow facility. This release from the British Geological Survey (BGS) contains BGS and Drillers’ logs, cased hole and open hole wireline data, optical camera data, a listing of archived rock chips and a descriptive report. The mine water characterisation and monitoring borehole was drilled between 24th June and 16th December 2019 (start of drilling to casing installation date) to 56.9 m drilled depth. The cased borehole was wireline logged in January 2020 and hydrogeologically tested in February 2020. Rock chip samples were taken during the drilling process and have been archived at the National Geological Repository at BGS Keyworth. Further details can be found in the accompanying report http://nora.nerc.ac.uk/id/eprint/528080 DOI https://dx.doi.org/10.5285/d8d27fb5-3be4-4a54-aef7-8429ec234667

  • The borehole information pack from borehole GGA02, site 01 of the UK Geoenergy Observatories (UKGEOS) Glasgow facility. This release from the British Geological Survey (BGS) contains BGS and Drillers’ logs, cased hole wireline data, details on fibre-optic cable installation, a listing of archived rock chips and a descriptive report. The borehole was drilled between 17th June and 20th September 2019 (start of drilling to casing installation date) to 94.16 m drilled depth as a mine water characterisation and monitoring borehole. Unfortunately, during the final stages of construction grout entered inside the casing, the casing was damaged and the borehole is now available as a sensor testing borehole to 67.2 m. The cased borehole was wireline logged in January 2020. Rock chip samples were taken during the drilling process and have been archived at the National Geological Repository at BGS Keyworth. Further details can be found in the accompanying report http://nora.nerc.ac.uk/id/eprint/528076 DOI https://dx.doi.org/10.5285/189dac62-b720-4fde-8260-f129fb9b0233